Rehabilitation of Wolfe Avenue

The Town of Petawawa has contracted Do-All Construction for the Rehabilitation of Wolfe Avenue from Victoria Street southerly to Garrison Petawawa South Townsite (a distance of 0.5 km). The project is scheduled to begin construction in May 2024 and is anticipated to be completed in July 2024.

The project works will include paving and grading, concrete curb and gutter, concrete sidewalk, multi-use pathway, storm sewer improvements, sanitary sewer improvements and sanitary sewer rehabilitation by cured-in-place pipe lining (CIPP), water system improvements, landscaping, site restoration and line painting.

Road closures will be required to complete the work. Detours will be put in place. There may be periods when access to driveways will be restricted (asphalt paving, new pipeline installation, etc.), however, the contractor will provide affected residents with as much notification as possible.

Properties located adjacent to the limits of construction will receive a notification from Englobe, on behalf of Do-All Construction requesting authorization to complete a pre-construction inspection of their private property. Property owners are encouraged to schedule this free inspection prior to the start of construction, and should be advised that these inspections will only be performed at the discretion of the individual property owners or their representatives. This inspection is completed to provide a baseline of the condition of the house prior to the commencement of construction. It would only be referred to should a resident feel that damage was done to their house as a result of the construction activity.

The engineering firm of Jp2g Consultants Inc. has been retained to complete the contract administration and on-site inspection services required by this project. Residents or property owners are encouraged to contact Brandon Harkins from Jp2g Consultants Inc. at 613-735-2507 or by email brandonh@jp2g.com should you have any questions or concerns relating to this project during the course of construction.

The Town of Petawawa appreciates residents' patience and cooperation throughout this construction project.


Road Closures

Wolfe Avenue will be closed from Victoria Street to Mohns Avenue from April 29, 2024 to May 31, 2024. A detour will be put in place to access Wolfe Avenue, from Mohns Avenue to Garrison Petawawa property.

Wolfe Avenue, from Mohns Avenue to the Garrison Petawawa property will have at least one lane open to through traffic, with traffic control as necessary.